The joy of cutting the ceremonial ribbon and walking through the door of a newly constructed community center does not come without its challenges. The fresh paint serves as a visual cue of accomplishment to those who have invested their precious time and effort. The new building aroma is welcoming and gives way to the finished product. It also has a uniquely artistic way of masking the hours of planning, scheduling and coordinating orchestrated by dozens of laborers, masons and contractors.
The pure delight in the eyes of the children and families entering a community center for the first time is what motivates us to construct a quality building, one that is functional for facilitating the distribution of services provided by Children International and our sponsors.
I remember walking the bare piece of land some 10 months ago that is now home to The Nina Rae Wesson Community Center. I recall thinking construction would be tight. The small terrain, closely surrounded by a heavily trafficked park and a few moderately used neighborhood thoroughfares, was not the ideal construction site.
We began the process of selecting a contractor more than a year ago. After working through some minor design changes we adjusted our model to fit the land and requirements of our programs.Similar to projects here in the U.S, communication and coordination on a project of this magnitude are essential. We are fortunate to have a solid staff in Jalisco, complemented by a knowledgeable construction supervisor.
As anticipated, the early challenges we experienced were with the steeply sloped and rocky terrain. The solid rock provides an excellent support for the building but required hours of jackhammering to accurately manicure the openings for the foundation.
As the building grew out of the ground and the structure began to take shape, our team continued to finalize touches that would best serve the community. It was a true collaboration between the contractor and Children International. The exterior façade was selected based on durability and local architecture. Interior finishes were chosen considering ease of maintenance and functionality. It seemed logical to have tile throughout as opposed to carpet and drop ceilings as opposed to open trusses to maintain a cool environment.

